Skip to the content
logo mainlogo darklogo light
  • Services
    • Interior design
    • Turnkey renovation
    • Kitchen renovation
    • Bathrooms renovation
    • Project management
  • Portfolio
    • Case studies
    • Gallery
    • All projects
  • Journal
    • Interior design
    • How to choose a contractor
    • Cost of repairs in NYC
    • Planning tips
    • Trends and Inspiration
    • Case studies
    • Licensing and approval issues
    • Materials and suppliers
  • Pricing
    • Cost breakdown
    • Cost calculator
  • About Us
    • History of Hoppler
    • Team
    • Partners and suppliers
    • Reviews
    • Frequently asked questions
  • Contact Us
logo main
  • Services
    • Interior design
    • Turnkey renovation
    • Kitchen renovation
    • Bathrooms renovation
    • Project management
  • Portfolio
    • Case studies
    • Gallery
    • All projects
  • Journal
    • Interior design
    • How to choose a contractor
    • Cost of repairs in NYC
    • Planning tips
    • Trends and Inspiration
    • Case studies
    • Licensing and approval issues
    • Materials and suppliers
  • Pricing
    • Cost breakdown
    • Cost calculator
  • About Us
    • History of Hoppler
    • Team
    • Partners and suppliers
    • Reviews
    • Frequently asked questions
  • Contact Us
logo main
  • Services
    • Interior design
    • Turnkey renovation
    • Kitchen renovation
    • Bathrooms renovation
    • Project management
  • Portfolio
    • Case studies
    • Gallery
    • All projects
  • Journal
    • Interior design
    • How to choose a contractor
    • Cost of repairs in NYC
    • Planning tips
    • Trends and Inspiration
    • Case studies
    • Licensing and approval issues
    • Materials and suppliers
  • Pricing
    • Cost breakdown
    • Cost calculator
  • About Us
    • History of Hoppler
    • Team
    • Partners and suppliers
    • Reviews
    • Frequently asked questions
  • Contact Us

October 2026

Home2026
13
Oct
Opening in a plaster wall above a marble wainscot, showing a metal-armored cable entering a steel box and its wires joined to a yellow cable with black tape outside the box
administrator
Materials and suppliers

The Wiring You Inherited With the Apartment

You bought the apartment with a finished kitchen, extra outlets along the counter and a row of recessed lights in the living room. Two years later you decide to redo the bathroom, and the electrician you hired opens the wall behind the vanity. Inside

Read More
10
Oct
Two bays of off-white Shaker base cabinets under a Carrara marble countertop, with horizontal brass bar pulls on the drawer fronts and two mirrored vertical pulls on the doors at the seam
administrator
Materials and suppliers

Cabinet Hardware Sizing Starts With the Door

Cabinet hardware is bought last and installed last, usually after the cabinets are hung and everyone is tired. Then the installer holds a pull against a door, and it does not sit flat. The base of the pull is wider than the flat face of the stile, so

Read More
7
Oct
Walk-in shower in dark grey-green marble with a brass rain shower head and linear drain on the back wall, a low marble curb and a frameless glass panel held by black clamps
administrator
Planning tips

The Quarter Inch That Decides Whether Your Shower Has a Curb

On the drawings a new bathroom usually looks like this: one stone floor runs from the vanity straight into the shower, nothing to step over, a thin slot against the far wall to take the water. It looks like a styling decision. On site it is a height

Read More
4
Oct
Empty pre-war apartment room under renovation with a neat rectangular opening in the wall showing old wood lath and studs, protective board taped over the floor and a rolled drawing on a folding table
administrator
How to choose a contractor

The Permit Notice Is the Best Test of a Contractor

Most owners check a contractor the way they check a restaurant: reviews, photographs, a few phone calls. The license number gets looked up once, it comes back active, and the question feels closed. Then the architect starts preparing the filing and a

Read More
1
Oct
Empty pre-war apartment prepared for renovation with protective board taped over the floor and a doorway sealed with clear plastic taped to its molded casing, with a lit room visible beyond
administrator
How to choose a contractor

What Your Building Asks of a Contractor, Beyond the License

Anyone who has renovated a New York apartment knows the moment: before a single wall is touched, the managing agent sends back a list. Proof of insurance, with the building named on it. The contractor’s license and registration. Plumber’s

Read More
28
Sep
White oak kitchen cabinets fixed to the wall of a pre-war Manhattan apartment during installation, some base units still open without fronts, with rough electrical boxes on the wall and plywood protecting the herringbone floor
administrator
Cost of repairs in NYC

Two Pieces of Paper Decide What Your Renovation Costs

Two owners on the same line of the same building spend $150,000 on the same kitchen. One of them never signs a one-page state form, so the contractor adds sales tax to every invoice and the checks total $163,312. When the job ends, that owner also th

Read More
25
Sep
Thick yellowed paint on a pre-war window casing with a hand-sized chip showing pale green and cream layers under the white and bare wood at the center, chipped paint along the sill edge, a neighboring brick facade with window air conditioners beyond the glass
administrator
How to choose a contractor

Why Repainting the Trim Is Not a Weekend in a Pre-War Building

The call arrives in the same shape every time. Trim in two rooms has yellowed, a window sash sticks, and the plan is a week of painting while the family is away. In a pre-war building it takes longer, and the reason is the paint. Nothing is wrong wit

Read More
22
Sep
Dark walnut kitchen with honed white marble counter and backsplash, a stainless gas range under a walnut hood enclosure, a wall-mounted brass faucet over an undermount sink, and a window looking onto neighboring brick buildings
administrator
How to choose a contractor

What Happens to Your Deposit Before the Work Starts

The first payment on a renovation is the strangest one you will ever make. Every other check you write in your life buys something that exists. This one buys a start date, a place in someone else’s schedule, and a crew that has not shown up yet

Read More
19
Sep
Luxury bathroom with the marble complete, a dark green stone shower alcove and white Carrara walls, and bare brass supply stubs and waste outlets protruding where the sinks will go
administrator
Planning tips

Why the Bathroom Is Always Finished Last

Somewhere near the end of an apartment renovation there is a week when the bathroom looks finished and cannot be used. The tile is on the wall. The fixtures are in the hallway in their boxes. Nobody is working in there, and nothing is wrong. The room

Read More
16
Sep
Empty freight elevator car seen from the corridor, its walls hung with quilted protective pads, with a worn steel floor and painted corridor walls on either side
administrator
Planning tips

What Fits in the Elevator Decides the Kitchen

A countertop that stops at the last turn in the corridor is a routine failure in this city, familiar to any fabricator working in pre-war buildings. Nothing about the stone is wrong when it happens. The route is wrong, and the route was never measure

Read More

Posts pagination

1 2 … 10

Journal

  • The Wiring You Inherited With the Apartment
  • Cabinet Hardware Sizing Starts With the Door
  • The Quarter Inch That Decides Whether Your...
  • The Permit Notice Is the Best Test of a Co...
  • What Your Building Asks of a Contractor, B...

QUICK LINKS

  • About Us
  • Interior Design & Renovation Services in Manhattan, NYC
  • Portfolio
  • Journal

Contact

A: 450 Lexington Ave, New York, NY 10017

E: info@hopplerdesignbuild.com

T: +1(212) 470-1144‬

H: Monday to Friday 9am - 6pm

Terms and conditions   |   Privacy Policy
© 2026 Hoppler Design & Build, All Rights Reserved

Kitchen Renovation Estimate Request

Answer a few quick questions so our team can understand your project and prepare the next step for a detailed estimate.

A detailed kitchen estimate requires measurements, project scope review, material level, cabinetry details, appliances, and building requirements. You can either provide approximate kitchen dimensions or request an on-site measurement.

What type of kitchen project are you planning?

Where is the property located (ZIP Code)?

What type of property is this?

Are you planning to change the layout?

What level of finishes are you considering?

Premium and luxury finishes may include custom cabinetry, natural stone, high-end appliances, designer lighting, and specialty hardware.

Do you need design services?

What investment range are you considering for this kitchen renovation?

Our kitchen renovation projects typically start from $70,000.

When would you like to start the project?

How would you like us to prepare your detailed estimate?

Kitchen Dimensions

Please provide your approximate kitchen dimensions.

Approximate dimensions are enough for the first review. Final pricing may require an on-site measurement and scope confirmation.

On-Site Measurement Request

When would you prefer us to visit the property?

Our team will contact you to confirm the appointment before visiting the property.

Almost done. Please share your contact details.

Preferred contact method

Thank you. Your kitchen estimate request has been received.

Our team will review your answers, kitchen dimensions, photos or plans, and contact you to discuss the scope and next steps for a detailed estimate.

Our team will contact you to confirm your preferred measurement date and time. After the on-site review, we will prepare the next step for your detailed kitchen estimate.