Luxury Kitchen Renovation & Remodeling in Manhattan, NYC
Where elegance meets functionality - bespoke kitchen designs for Manhattan's most refined homes As Manhattan's premier kitchen remodeling contractor, we handle every detail — from design and permits to custom installation and final styling. Turnkey luxury kitchens for apartments, penthouses, and townhouses across NYC
Kitchen Remodeling Services in Manhattan, NYC
Hoppler Design & Build is a full-service kitchen remodeling contractor in
Manhattan. We manage every project from initial design and permit coordination
to custom installation and final handover — working across co-ops, condos,
penthouses, and townhouses throughout NYC.
Forget the disjointed handoffs between separate designers and outside
trades. We deliver true end-to-end, single-point accountability. One
dedicated team executes your vision from the preliminary site visit to the
exact moment you step into your flawlessly finished kitchen.
Our Kitchen Expertise Includes
Full Kitchen Remodels
Complete kitchen renovation from demolition to final installation — including rough work, finishes, cabinetry, countertops, appliances, and final detailing
Custom Cabinetry
Built-in storage, panel-ready appliance integration, custom millwork, precision installation, and cabinetry designed around your exact space
Premium Countertops & Backsplashes
Marble, quartzite, porcelain slabs, waterfall islands, full-height backsplashes, and detailed edge profiles for a refined kitchen finish
High-End Appliance Integration
Seamless integration of Sub-Zero, Wolf, Miele, Gaggenau, Thermador, panel-ready refrigeration, built-in ovens, ventilation, and smart appliances
LAYERED LIGHTING DESIGN
Illumination engineered to enhance both atmosphere and utility. Implementing ambient recessed fixtures, precision task lighting, under-cabinet glows, and automated dimming systems.
Smart Kitchen Solutions
Concealed technology, integrated outlets, charging drawers, smart home systems, storage accessories, and modern convenience features
SIGNATURE KITCHEN AESTHETICS
From sleek high-rise condos to historic pre-war residences, we execute bespoke kitchen renovations tailored to your lifestyle and the unique architectural nuances of Manhattan real
estate.

Modern & Smart
Clean lines, integrated appliances, concealed storage, panel-ready systems, hidden outlets, smart lighting, and seamless technology integration. Designed for Tribeca lofts, Midtown penthouses, and contemporary Manhattan apartments

Classic & Timeless
Custom hardwood cabinetry, Carrara marble, crown moldings, refined hardware, and elegant detailing for kitchens that feel established, warm, and enduring. Built for pre-war Manhattan apartments where heritage, proportion, and craftsmanship matter

Open Concept
We plan open kitchen layouts with wall removal, structural coordination, appliance placement, lighting, circulation, and co-op or condo board approvals managed from start to finish. Designed for clients who want the kitchen to connect naturally with dining and living areas

CUSTOM COMPACT
For compact Manhattan kitchens, every inch matters. We use ceiling-height cabinetry, integrated appliances, custom storage, smart layouts, and millwork designed specifically for your apartment. No space is too tight to design well
How We Bring Your Dream Kitchen to Life
1. Kitchen Renovation Consultation.
We start with a private site visit—assessing your space, understanding your vision, and
outlining realistic timelines. For co-op and condo owners, we review building requirements
and alteration agreements from day one. Board approvals and city permits are integral to
our process, not an afterthought.
2. CUSTOM DESIGN & 3D PLANNING
Our design team develops a concept tailored to your
apartment, covering layout, cabinetry, and finishes. You
receive detailed 3D visualizations to experience the
space before a single wall is touched
3. MATERIAL & APPLIANCE CURATION
We guide you through curated material and appliance options drawn from our international supplier network.
Every selection is made with your budget, lifestyle, and building requirements in mind
4. CONSTRUCTION & INSTALLATION
Our crews handle all construction, plumbing, electrical, and cabinetry installation. We coordinate building
access, manage deliveries, and keep your project on schedule — with daily updates throughout
5. Final Styling & Project Handover
Once construction is complete, we do a full professional clean and a detailed walkthrough with you. We don’t
consider a project finished until you do
1. Kitchen Renovation Consultation
We start with a private site visit—assessing your space, understanding your vision, and outlining realistic timelines. For co-op and condo owners, we review building requirements and alteration agreements from day one. Board approvals and city permits are integral to our process, not an afterthought.
2. CUSTOM DESIGN & 3D PLANNING
Our design team develops a concept tailored to your apartment, covering layout, cabinetry, and finishes. You receive detailed 3D visualizations to experience the space before a single wall is touched
3. MATERIAL & APPLIANCE CURATION
We guide you through curated material and appliance options drawn from our international supplier network. Every selection is made with your budget, lifestyle, and building requirements in mind
4. CONSTRUCTION & INSTALLATION
Our crews handle all construction, plumbing, electrical, and cabinetry installation. We coordinate building access, manage deliveries, and keep your project on schedule — with daily updates throughout
5. Final Styling & Project Handover
Once construction is complete, we do a full professional clean and a detailed walkthrough with you. We don’t consider a project finished until you do
Built for Manhattan Apartments, Co-ops & Condos
Kitchen remodeling in Manhattan is never just about design. Many buildings have strict requirements for permits, insurance, work hours, freight elevator reservations, plumbing access, electrical upgrades, dust
protection, and noise control.
Hoppler Design & Build plans your kitchen renovation around these realities from the beginning. We coordinate with your building, prepare the required documentation, and manage the construction process so
the project can move forward with fewer delays and fewer surprises
What We Coordinate
- Co-op and condo alteration agreements
- DOB Permits and Architectural Approvals
- Building management communication
- General Liability and Workers’ Compensation documentation
- Freight elevator and delivery scheduling
- Floor, wall, elevator, and common area protection
- Plumbing and electrical coordination
- Work-hour and noise restrictions
REQUEST your kitchen walkthrough
Select your preferred date below, and our senior design team will reach out to confirm your initial consultation.
Site visit available within 48–72 hours
Project Timeline
Full Kitchen Renovation: 6–10 Weeks From Demo to Completion
6-10 weeks
From demo to completion
We Don’t Rush
If you need a kitchen done in under 6 weeks, we’re not the right fit. Quality installation in a Manhattan building takes the time it takes
Dedicated Crews
We run 3 dedicated crews, each paired with a project coordinator.
Your Crew Stays On Your Job
We don’t stack projects. When we take on your renovation, your crew is on your job.
Important: Design, approvals, cabinetry production, appliance lead times, and material ordering happen
before on-site construction and are not included in the 6–10 week installation timeline.
Signature Kitchen Renovations in Manhattan
From sleek contemporary kitchens in Tribeca to timeless classics on the Upper East Side — explore kitchen concepts and completed
renovation work designed for Manhattan apartments, penthouses, co-ops, condos, and townhouses.
Only the Finest Materials
We source only the finest materials through our international network of luxury suppliers. Every kitchen renovation we deliver in Manhattan features:
- Italian and Greek marble countertops — Calacatta, Statuario, Thassos
- German-engineered cabinetry systems — precision joinery, soft-close hardware
- Custom millwork crafted to the exact dimensions of your apartment
- Designer fixtures and fittings from Waterworks, Dornbracht, and Rohl
- Smart appliance integration: Sub-Zero, Wolf, Miele, and Gaggenau
- Premium flooring: white oak, reclaimed limestone, large-format porcelain
Every element is selected not only for beauty, but also for durability, proportion, maintenance, and how it performs in daily use.
PRICING & SCOPE
Kitchen Renovation Cost in Manhattan
Kitchen renovations in Manhattan start from $70,000. We specialize in fully custom, high-end kitchens — partial remodels and budget projects are outside our scope.
Most kitchen remodeling projects fall within the $70,000 – $200,000+ range. Cost is shaped by cabinetry, appliances, countertops, layout changes, and any electrical or plumbing work involved.
For full apartment renovation projects that include demolition, construction, plumbing, electrical, cabinetry, appliances, and finishes as part of a larger total scope, project budgets typically start from $200,000+.
We provide itemized proposals after a site visit. No guesswork, no surprise change orders.
What’s Included That Others Often Charge Separately
- Design concept and 3D rendering
- Full project insurance
- Permitting coordination
- Project coordination
- Detailed scope of work
- Final cleaning and project handover
Cabinetry is priced per linear foot and varies based on manufacturer, style, complexity, and internal configuration. Exact pricing is provided after the design is finalized.
CABINETRY & APPLIANCES
Cabinetry & Materials
Cabinetry Lead Times
- Italian factory cabinets: 3–6 months, including manufacturing and shipping to NYC
- US-made custom cabinets: 1–3 months
- Cabinet installation once on-site: 3–7 business days
Appliances
High-end Manhattan kitchens are typically outfitted with integrated appliances from Sub-Zero / Wolf, Miele, Gaggenau, or Thermador. Appliance packages generally range from $15,000 to $40,000+, depending on brand and configuration.What Drives Cost in NYC Kitchens
A well-executed kitchen is a balance of design, engineering, and craftsmanship — not just a matter of finishes. The final cost depends on how much custom work is required, the level of cabinetry, the appliance package, the stone selection, and the complexity of construction inside the building.Key Cost Factors
- Custom millwork and precision installation
- Electrical upgrades, especially in pre-war buildings
- Ventilation system requirements
- Seamless integration of appliances into cabinetry
Why Manhattan Homeowners Choose Hoppler
Full-Service, Start to Finish
Most firms do design or construction. We do both, under one contract. That means no gaps, no finger-pointing between vendors, and no managing multiple parties on your own.
You work with us. We handle everything else.
We Know Manhattan Buildings
Co-op alteration agreements, DOB permits, wet-over-dry restrictions, landmark guidelines, elevator logistics — we’ve navigated all of it, across all building types in NYC.
If there’s a complication, we’ve likely seen it before.
Direct Access to Premium Materials
We source Italian marble, German cabinetry, and international hardware directly — no showroom middlemen.
You get the same materials at better pricing, with our team verifying quality before anything ships to your apartment.
You See It Before We Build It
Every project starts with a full 3D design. You approve the layout, finishes, and configuration before demolition begins.
No guesswork, no surprises mid-construction.
Fixed Scope. Transparent Budget.
Every change goes through a formal Change Order — nothing is added to your bill without your sign-off.
You receive weekly project updates and know exactly where your project stands at every stage.
Built With Protection, Documentation & Accountability
Warranty
- 2-year warranty on all labor and workmanship.
- 5-year warranty on waterproofing.
- 2–5 year manufacturer warranty on Italian cabinetry, issued directly by the factory.
Payment Structure
- 30% — before work begins
- 20% — after demolition is complete
- 25% — after rough work is finished: plumbing, electrical, waterproofing
- 25% — upon full completion and final cleaning
Licenses & Documentation
- We are fully licensed, insured, and certified to operate in New York City.
- NYC Home Improvement Contractor License
- General Liability Insurance
- Workers’ Compensation Coverage
All documentation is available upon request.
How We Work
- Daily updates — progress report every working day
- Premium materials only — no substitutions without your approval
- Professional final cleaning — move-in ready on handover day
- Free site visit — within 48–72 hours of your inquiry
- We don’t work on self-managed projects — our process runs as one coordinated team
That’s how we protect quality, timeline, and accountability.
Your Project Coordinator
Every project is assigned a dedicated project coordinator — one point of contact from the first site visit through final walkthrough.
Your coordinator manages crew scheduling, material deliveries, building communications, and daily client updates.
Who We Work With
We work with owners of condos, co-ops, and townhouses in New York City who are investing in a full-scope, high-end renovation.
Our process requires complete alignment before we start — design, budget, timeline, and building approvals.
If you are looking for the lowest bid or the fastest shortcut, we may not be the right fit. If you want a kitchen built with planning, precision, and accountability, let’s talk.
What Our Clients Say
Hoppler’s designers maximized every inch
"“Our old kitchen felt dark and small - now it’s a bright, open space with character. Hoppler’s designers maximized every inch while keeping the aesthetic elegant and clean. It feels luxurious yet welcoming.”"
Joe C.
The kitchen renovation went smoother than we could have imagined
"“The kitchen renovation went smoother than we could have imagined. Hoppler designed a layout that finally makes sense for daily life and entertaining. The materials are high-end but practical, and every drawer and cabinet feels purposeful. It’s truly the heart of our home now.”"
Samuel R.
Schedule Your Kitchen Measurement & Project Review
Please choose a preferred time, and our project coordinator will get in touch shortly.
During the site visit, we review your space, project goals, building requirements, timeline, and
expected budget.
Site visit available within 48–72 hours
Kitchen Renovation FAQ
1. How much does a kitchen renovation cost in NYC?
Kitchen renovation costs in NYC vary depending on cabinetry, appliances, countertops, layout changes, building requirements, and the level of customization.
High-end Manhattan kitchen renovations typically start from $70,000 and can exceed $200,000 for full custom scopes.
2. How long does a kitchen remodel take in Manhattan?
A full kitchen remodel typically takes 6–10 weeks from demolition to completion.
This does not include design development, co-op or condo approvals, cabinetry production, appliance lead times, or material ordering.
3. Do I need a permit for a kitchen renovation in NYC?
Many kitchen renovations require permits, especially when plumbing, electrical, gas, ventilation, or layout changes are involved.
We review permit requirements during the planning phase and help coordinate the required documentation.
4. Do you handle co-op and condo board approvals?
Yes. We help coordinate documentation for co-op and condo board review, alteration agreements, insurance requirements, and building management communication.
5. What kitchen styles do you specialize in?
We specialize in modern, classic, timeless, open-concept, small-space, and fully custom luxury kitchens for Manhattan apartments, penthouses, townhouses, co-ops, and condos.
6. Do you work across all Manhattan neighborhoods?
Yes. We work across Manhattan and NYC, including apartments, co-ops, condos, penthouses, and townhouses.
